quote:
Originally posted by Devon:
Sheesh, calm down. You're wrong anyway. It takes a Hotwire/Tech almost exactly 7 seconds to place all their C4 (and they have one timed more than engies) so by waiting a bit longer than 20 seconds before you detonate the C4 you get the optimal result. I'm guessing an engineer would need about 5 seconds to place all their C4. If you blow the remotes right away, the other team will have 25 seconds to repai the building enough so that the second blast won't destroy it, saving the building. That's way more time than they usually need.
wouldn't really matter, cause remember, there is another engi team that could blow the c4 right away, and it would give no warning because of the first biulding being blasted. Its just like that diversion tactic someone has up