Renegade Public Forums
C&C: Renegade --> Dying since 2003™, resurrected in 2024!
Home » Renegade Discussions » Mod Forum » Optimised Construction Yard
Optimised Construction Yard [message #-988734] Sun, 22 December 2002 17:20 Go to previous messageGo to previous message
Anonymous
quote:
Originally posted by PiMuRho:
Picture 1

Picture 2

740 polys (including crane)

Currently working on the interior (aiming for about 300 polys)

I told you it was possible to do it with half the polygons. Smile

Work on the textures next. Some, like the crane's texture, are stretched out.
 
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Read Message
Previous Topic: Progress pictures for Red Alert 2 Mod.
Next Topic: repair pads.
Goto Forum:
  


Current Time: Fri Jan 24 12:14:48 MST 2025

Total time taken to generate the page: 0.00900 seconds